top of page
  • Writer's pictureBrian Boelk

Third Street: Updated Traffic Control

In the upcoming days, Road Closed signs and barricades will be moved aside opening up the roads for PHASE 2 portion of the project, which is west of Greene Street. Barricades are to remain in place for PHASE 1 as construction continues. Residents within the project limits of PHASE 1, Greene Street and east, need to refrain from moving the signage and barricades and shall not drive down or park on Third Street. Notification will be provided as construction phasing changes.

17 views0 comments

Recent Posts

See All

And the Heat keeps coming

Just wanted to update everyone that we are going to push back the tilling, final grading, and seeding to the 2nd or 3rd week in September due to the projected weather, which is hot and dry. Weed and f

Restoration is on the way!

Despite the extreme heat we are experiencing this week, you will soon be seeing some action taken on remaining restoration and clean-up along Third Street. Due to weather and specifications, the cont

bottom of page